Infrastructure
Dynamic is delivering critical flood protection infrastructure as part of the West Shore Lake Pontchartrain (WSLP) project in Southeast Louisiana. This $3.7 billion initiative will provide 100-year storm surge risk reduction for surrounding communities.
This phase of the project, Reach 106, showcases Dynamic’s expertise in pile driving and levee construction adjacent to active infrastructure, as well as our ability to perform complex marine and heavy civil construction in constrained, high-traffic zones. Dynamic has coordinated closely with the Louisiana Department of Transportation and Development (LADOTD) to minimize disruption along Interstate 10, one of the state’s busiest corridors.
The concrete T-wall crossing under an elevated section of the interstate requires installing 36-inch steel pipe piles on each side of the wall to create a temporary retaining structure. Inside the barrier, Dynamic is driving deep H-piles to support the cast-in-place concrete T-wall.
This work demonstrates precision in pile driving, levee construction, and geotechnical engineering adjacent to critical infrastructure while integrating structural, marine, and civil services.
The West Shore Lake Pontchartrain project enhances Southeast Louisiana’s flood protection and demonstrates Dynamic’s ability to deliver complex civil works.
The West Shore Lake Pontchartrain project is one of the largest civil works efforts in Louisiana history, providing long-term storm surge defense for thousands of residents. Dynamic’s role underscores our expertise in large-scale flood protection projects, our ability to work seamlessly in constrained environments, and our community commitment.
See more Dynamic Infrastructure projects.