{"id":667,"date":"2025-09-23T20:36:21","date_gmt":"2025-09-23T20:36:21","guid":{"rendered":"https:\/\/mybncsite.com\/dynamic\/?p=667"},"modified":"2025-10-24T21:37:55","modified_gmt":"2025-10-24T21:37:55","slug":"morial-convention-center-medical-facility","status":"publish","type":"post","link":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/","title":{"rendered":"Emergency Temporary Facilities"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Meeting the Urgent Need for Medical Surge Capacity<\/h2>\n\n\n\n<p>When COVID-19 threatened to overwhelm Louisiana\u2019s hospitals in 2020 during the early days of the pandemic, the state turned to Dynamic to design and build a large-scale temporary medical facility inside the Morial Convention Center in New Orleans, the fifth largest convention center in the country. Dynamic mobilized within hours and immediately identified critical structural and operational gaps in the state\u2019s initial design. Our team led a full redesign that maximized patient density, safety, and efficiency, while meeting strict medical care requirements.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Rapid Deployment and Expansion<\/h2>\n\n\n\n<p>Dynamic delivered results under a very aggressive schedule:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>112 patient rooms commissioned within 48 hours of notice to proceed<\/li>\n\n\n\n<li>1,000 patient rooms and 65 nurse stations completed in 9 days<\/li>\n\n\n\n<li>In total, Dynamic outfitted the 750,000 square foot facility with 2,000 patient rooms, 132 nurse stations, 100 restroom\/shower units, dining, break, and storage areas within weeks<\/li>\n<\/ul>\n\n\n\n<p>The Louisiana Department of Health admitted patients just 10 days after issuing Dynamic a notice to proceed, well ahead of schedule.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Facility Features<\/h2>\n\n\n\n<p>Dynamic coordinated 17 subcontractors and suppliers to design, construct, and operate a fully functional medical surge facility. Our scope of work included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structures &amp; Environmental Controls<\/strong> \u2013 Tent structures, flooring, temporary HVAC, and power systems<\/li>\n\n\n\n<li><strong>Medical &amp; Support Spaces<\/strong> \u2013 Individual patient rooms, nurse stations, ADA-compliant bathrooms, showers, and handwashing sinks<\/li>\n\n\n\n<li><strong>Technology &amp; Connectivity<\/strong> \u2013 WIFI, VOIP, VPN, and IT systems for patient record access<\/li>\n\n\n\n<li><strong>Operations &amp; Logistics<\/strong> \u2013 Material staging, food service coordination, custodial services, and utilities management<\/li>\n<\/ul>\n\n\n\n<p>We equipped every patient room with power, lighting, and neutral-pressure conditioned air to meet medical standards. Our team build an IT system that integrated nurse stations with outside networks to support clinical operations.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Innovative Project Management<\/h2>\n\n\n\n<p>To manage the pace and complexity of construction, Dynamic implemented SWETM (Sewer, Water, Electrical, Transportation, Medical) project tracking. Each wing featured a color-coded whiteboard updated daily to monitor progress, resolve bottlenecks, and accelerate punch list completion. This simple yet effective visual system helped crews maintain speed and focus under pressure.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Human-Centered Touches<\/h2>\n\n\n\n<p>Beyond construction, Dynamic made the facility a more welcoming space for patients and staff by adding 1,230 inspirational posters in patient rooms and common areas as well as 280 orchids and 50 green plants distributed throughout nurse stations and hallways. These small additions helped reduce stress and boost morale during an unprecedented crisis.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Results That Matter<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>112 rooms in 48 hours<\/li>\n\n\n\n<li>1,000 rooms in 9 days<\/li>\n\n\n\n<li>2,000 rooms completed on schedule<\/li>\n\n\n\n<li>750,000 square feet of medical surge space delivered<\/li>\n<\/ul>\n\n\n\n<p>Louisiana officials praised the speed, quality, and impact of Dynamic\u2019s work, recognizing our ability to mobilize quickly and deliver under extreme emergency conditions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Why It Matters<\/h2>\n\n\n\n<p>The Morial Convention Center medical surge facility was one of the largest emergency medical construction projects in the country during the early days of COVID-19. Dynamic\u2019s leadership demonstrated:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ability to mobilize and deliver <strong>mega-scale projects under national emergency conditions<\/strong><\/li>\n\n\n\n<li>Proven expertise in <strong>temporary healthcare facility construction<\/strong><\/li>\n\n\n\n<li>A commitment to <strong>saving lives and supporting communities<\/strong> during crises<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Partner With Us<\/h2>\n\n\n\n<p>Dynamic delivers <strong>emergency medical, housing, and disaster support facilities<\/strong> at scale. Our work at the Morial Convention Center proves our ability to meet the most urgent needs with speed, precision, and compassion.<\/p>\n\n\n\n<p>\ud83d\udc49 <a href=\"https:\/\/mybncsite.com\/dynamic\/projects\/\">Explore More Projects<\/a> to see how we deliver under the most challenging conditions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Meeting the Urgent Need for Medical Surge Capacity<\/p>\n","protected":false},"author":7,"featured_media":729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[55,26,23,15],"class_list":["post-667","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-emergency-response","tag-covid","tag-emergency","tag-local-govt","tag-louisiana"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Morial Convention Center Medical Facility | Dynamic Group<\/title>\n<meta name=\"description\" content=\"Dynamic built a 2,000-room medical surge facility at the Morial Convention Center in 9 days, expanding Louisiana\u2019s hospital capacity during COVID-19.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Morial Convention Center Medical Facility | Dynamic Group\" \/>\n<meta property=\"og:description\" content=\"Dynamic built a 2,000-room medical surge facility at the Morial Convention Center in 9 days, expanding Louisiana\u2019s hospital capacity during COVID-19.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/\" \/>\n<meta property=\"og:site_name\" content=\"Dynamic Group\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-23T20:36:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-24T21:37:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ian Rose\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@dynamic_grp\" \/>\n<meta name=\"twitter:site\" content=\"@dynamic_grp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Rose\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/\"},\"author\":{\"name\":\"Ian Rose\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/071bc5cc557b820448c38fb7c5dcd697\"},\"headline\":\"Emergency Temporary Facilities\",\"datePublished\":\"2025-09-23T20:36:21+00:00\",\"dateModified\":\"2025-10-24T21:37:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/\"},\"wordCount\":532,\"publisher\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#organization\"},\"image\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg\",\"keywords\":[\"COVID\",\"Emergency\",\"Local Govt\",\"Louisiana\"],\"articleSection\":[\"Emergency Response\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/\",\"name\":\"Morial Convention Center Medical Facility | Dynamic Group\",\"isPartOf\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg\",\"datePublished\":\"2025-09-23T20:36:21+00:00\",\"dateModified\":\"2025-10-24T21:37:55+00:00\",\"description\":\"Dynamic built a 2,000-room medical surge facility at the Morial Convention Center in 9 days, expanding Louisiana\u2019s hospital capacity during COVID-19.\",\"breadcrumb\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg\",\"contentUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mybncsite.com\/dynamic\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Emergency Temporary Facilities\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#website\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/\",\"name\":\"Dynamic Group\",\"description\":\"We deliver excellence.\",\"publisher\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mybncsite.com\/dynamic\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#organization\",\"name\":\"Dynamic Group\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png\",\"contentUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png\",\"width\":200,\"height\":80,\"caption\":\"Dynamic Group\"},\"image\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/dynamic_grp\",\"https:\/\/www.linkedin.com\/company\/dynamic-construction-group\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/071bc5cc557b820448c38fb7c5dcd697\",\"name\":\"Ian Rose\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7f37dccdfa0b3cc2d8086808df2e71a07938d13e6b934c62900b8b7a89d175d2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7f37dccdfa0b3cc2d8086808df2e71a07938d13e6b934c62900b8b7a89d175d2?s=96&d=mm&r=g\",\"caption\":\"Ian Rose\"},\"url\":\"https:\/\/mybncsite.com\/dynamic\/author\/ian\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Morial Convention Center Medical Facility | Dynamic Group","description":"Dynamic built a 2,000-room medical surge facility at the Morial Convention Center in 9 days, expanding Louisiana\u2019s hospital capacity during COVID-19.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/","og_locale":"en_US","og_type":"article","og_title":"Morial Convention Center Medical Facility | Dynamic Group","og_description":"Dynamic built a 2,000-room medical surge facility at the Morial Convention Center in 9 days, expanding Louisiana\u2019s hospital capacity during COVID-19.","og_url":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/","og_site_name":"Dynamic Group","article_published_time":"2025-09-23T20:36:21+00:00","article_modified_time":"2025-10-24T21:37:55+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg","type":"image\/jpeg"}],"author":"Ian Rose","twitter_card":"summary_large_image","twitter_creator":"@dynamic_grp","twitter_site":"@dynamic_grp","twitter_misc":{"Written by":"Ian Rose","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#article","isPartOf":{"@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/"},"author":{"name":"Ian Rose","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/071bc5cc557b820448c38fb7c5dcd697"},"headline":"Emergency Temporary Facilities","datePublished":"2025-09-23T20:36:21+00:00","dateModified":"2025-10-24T21:37:55+00:00","mainEntityOfPage":{"@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/"},"wordCount":532,"publisher":{"@id":"https:\/\/mybncsite.com\/dynamic\/#organization"},"image":{"@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg","keywords":["COVID","Emergency","Local Govt","Louisiana"],"articleSection":["Emergency Response"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/","url":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/","name":"Morial Convention Center Medical Facility | Dynamic Group","isPartOf":{"@id":"https:\/\/mybncsite.com\/dynamic\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage"},"image":{"@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage"},"thumbnailUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg","datePublished":"2025-09-23T20:36:21+00:00","dateModified":"2025-10-24T21:37:55+00:00","description":"Dynamic built a 2,000-room medical surge facility at the Morial Convention Center in 9 days, expanding Louisiana\u2019s hospital capacity during COVID-19.","breadcrumb":{"@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#primaryimage","url":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg","contentUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/5e88d805a08e8.image-1.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/mybncsite.com\/dynamic\/morial-convention-center-medical-facility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mybncsite.com\/dynamic\/"},{"@type":"ListItem","position":2,"name":"Emergency Temporary Facilities"}]},{"@type":"WebSite","@id":"https:\/\/mybncsite.com\/dynamic\/#website","url":"https:\/\/mybncsite.com\/dynamic\/","name":"Dynamic Group","description":"We deliver excellence.","publisher":{"@id":"https:\/\/mybncsite.com\/dynamic\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mybncsite.com\/dynamic\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mybncsite.com\/dynamic\/#organization","name":"Dynamic Group","url":"https:\/\/mybncsite.com\/dynamic\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/","url":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png","contentUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png","width":200,"height":80,"caption":"Dynamic Group"},"image":{"@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/dynamic_grp","https:\/\/www.linkedin.com\/company\/dynamic-construction-group\/"]},{"@type":"Person","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/071bc5cc557b820448c38fb7c5dcd697","name":"Ian Rose","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7f37dccdfa0b3cc2d8086808df2e71a07938d13e6b934c62900b8b7a89d175d2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7f37dccdfa0b3cc2d8086808df2e71a07938d13e6b934c62900b8b7a89d175d2?s=96&d=mm&r=g","caption":"Ian Rose"},"url":"https:\/\/mybncsite.com\/dynamic\/author\/ian\/"}]}},"_links":{"self":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts\/667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/comments?post=667"}],"version-history":[{"count":2,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts\/667\/revisions"}],"predecessor-version":[{"id":1000,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts\/667\/revisions\/1000"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/media\/729"}],"wp:attachment":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/media?parent=667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/categories?post=667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/tags?post=667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}