{"id":680,"date":"2025-09-29T16:03:14","date_gmt":"2025-09-29T16:03:14","guid":{"rendered":"https:\/\/mybncsite.com\/dynamic\/?p=680"},"modified":"2025-10-24T21:33:42","modified_gmt":"2025-10-24T21:33:42","slug":"calcasieu-parish-school-reconstruction","status":"publish","type":"post","link":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/","title":{"rendered":"Reconstructing Calcasieu Parish Public Schools"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Restoring Learning Environments at Scale<\/h2>\n\n\n\n<p>In less than three years, two major hurricanes devastated Calcasieu Parish, damaging <strong>74 of 76 schools<\/strong> and leaving <strong>15 severely impacted<\/strong>. Dynamic stepped in to restore safe learning environments, delivering <strong>$61 million in critical repairs<\/strong> funded by FEMA Public Assistance.<\/p>\n\n\n\n<p>Dynamic led the reconstruction of nearly <strong>900,000 square feet<\/strong> of educational facilities. Due to the aggressive renovation plans to get the schools operational in a timely manner, Dynamic mobilized a full staff of project managers, superintendents, and general laborers within days of receiving each NTP, working to complete demolition of damaged sheetrock, removing insulation, debris, and unsafe exposed electrical. The expedited mobilization mitigated further weather damage and delays that would have posed as another obstacle in the reconstruction plans.<\/p>\n\n\n\n<p>Our scope included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>HVAC ductwork modifications and electrical system overhauls<\/li>\n\n\n\n<li>Multiple roof replacements<\/li>\n\n\n\n<li>Custom auditorium and theater renovations<\/li>\n\n\n\n<li>Upgrades to cafeterias, classrooms, offices, and bathrooms<\/li>\n<\/ul>\n\n\n\n<p>Our largest assignment was the <strong>$21 million phased reconstruction of WW Lewis Middle School<\/strong>, designed to maintain student safety while construction advanced in separate campus zones. Dynamic completed the summer phase in just one month\u2014well ahead of district expectations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Overcoming Challenges with Innovation<\/h2>\n\n\n\n<p>Hurricane recovery brought unique challenges, from material shortages to hidden design flaws. Dynamic worked proactively to keep projects on track:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Material Shortages<\/strong>: When a worldwide shortage of polyisocyanurate insulation threatened a six-month delay, we collaborated with architects to redesign the roof system using lightweight concrete and retrofitted steel decking, minimizing delays<\/li>\n\n\n\n<li><strong>Design Flaws<\/strong>: At LaGrange High School, our team identified a critical HVAC return system flaw and partnered with engineers to redesign it, ensuring safe, efficient performance<\/li>\n<\/ul>\n\n\n\n<p>Other challenges on these projects included planning to permit students back on campus while reconstruction efforts continue. For example, the reconstruction of Lewis Middle School was designed in phases, allowing for the work to continue safely while students attended classes in another part of the campus.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Results That Matter<\/h2>\n\n\n\n<p>Through proactive problem-solving and close collaboration with school board officials, engineers, and subcontractors, Dynamic:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Restored vital learning environments across Calcasieu Parish<\/li>\n\n\n\n<li>Returned more than <strong>3,300 students<\/strong> to safe, modern classrooms<\/li>\n\n\n\n<li>Delivered results <strong>on schedule and within budget<\/strong>, despite unprecedented obstacles<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Why It Matters<\/h2>\n\n\n\n<p>Schools are more than buildings\u2014they are centers of community stability. By restoring Calcasieu Parish\u2019s education system after back-to-back hurricanes, Dynamic:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Helped ensure <strong>continuity of education<\/strong> for thousands of students.<\/li>\n\n\n\n<li>Strengthened the community\u2019s <strong>long-term resilience and recovery<\/strong>.<\/li>\n\n\n\n<li>Proved our ability to deliver <strong>large-scale, multi-facility construction under emergency conditions<\/strong>.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Partner With Us<\/h2>\n\n\n\n<p>Dynamic specializes in <strong>education infrastructure recovery<\/strong> that restores safe, functional learning environments after disasters. Our work in Calcasieu Parish demonstrates how we deliver complex projects with speed, precision, and compliance.<\/p>\n\n\n\n<p>\ud83d\udc49 <a href=\"https:\/\/mybncsite.com\/dynamic\/projects\/\">Explore More Projects<\/a> to see how we rebuild schools, universities, and community facilities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Restoring Learning Environments at Scale<\/p>\n","protected":false},"author":5,"featured_media":727,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-680","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Calcasieu Parish School Reconstruction | Dynamic Group<\/title>\n<meta name=\"description\" content=\"Dynamic delivered $61M in Calcasieu Parish school reconstruction, restoring 900,000 sq. ft. of facilities and returning 3,300 students to classrooms.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Calcasieu Parish School Reconstruction | Dynamic Group\" \/>\n<meta property=\"og:description\" content=\"Dynamic delivered $61M in Calcasieu Parish school reconstruction, restoring 900,000 sq. ft. of facilities and returning 3,300 students to classrooms.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/\" \/>\n<meta property=\"og:site_name\" content=\"Dynamic Group\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-29T16:03:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-24T21:33:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leslie Leavoy\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@dynamic_grp\" \/>\n<meta name=\"twitter:site\" content=\"@dynamic_grp\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leslie Leavoy\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/\"},\"author\":{\"name\":\"Leslie Leavoy\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/4592d5856e4effd27663f9e5975ec81a\"},\"headline\":\"Reconstructing Calcasieu Parish Public Schools\",\"datePublished\":\"2025-09-29T16:03:14+00:00\",\"dateModified\":\"2025-10-24T21:33:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/\"},\"wordCount\":456,\"publisher\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#organization\"},\"image\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg\",\"articleSection\":[\"Infrastructure\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/\",\"name\":\"Calcasieu Parish School Reconstruction | Dynamic Group\",\"isPartOf\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg\",\"datePublished\":\"2025-09-29T16:03:14+00:00\",\"dateModified\":\"2025-10-24T21:33:42+00:00\",\"description\":\"Dynamic delivered $61M in Calcasieu Parish school reconstruction, restoring 900,000 sq. ft. of facilities and returning 3,300 students to classrooms.\",\"breadcrumb\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg\",\"contentUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"default\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mybncsite.com\/dynamic\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Reconstructing Calcasieu Parish Public Schools\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#website\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/\",\"name\":\"Dynamic Group\",\"description\":\"We deliver excellence.\",\"publisher\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mybncsite.com\/dynamic\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#organization\",\"name\":\"Dynamic Group\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png\",\"contentUrl\":\"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png\",\"width\":200,\"height\":80,\"caption\":\"Dynamic Group\"},\"image\":{\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/x.com\/dynamic_grp\",\"https:\/\/www.linkedin.com\/company\/dynamic-construction-group\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/4592d5856e4effd27663f9e5975ec81a\",\"name\":\"Leslie Leavoy\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/2210438cb9701e1718ab9c1e42615aa2fe7c9f50562d652a5410003891efc2f3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/2210438cb9701e1718ab9c1e42615aa2fe7c9f50562d652a5410003891efc2f3?s=96&d=mm&r=g\",\"caption\":\"Leslie Leavoy\"},\"url\":\"https:\/\/mybncsite.com\/dynamic\/author\/leslie\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Calcasieu Parish School Reconstruction | Dynamic Group","description":"Dynamic delivered $61M in Calcasieu Parish school reconstruction, restoring 900,000 sq. ft. of facilities and returning 3,300 students to classrooms.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/","og_locale":"en_US","og_type":"article","og_title":"Calcasieu Parish School Reconstruction | Dynamic Group","og_description":"Dynamic delivered $61M in Calcasieu Parish school reconstruction, restoring 900,000 sq. ft. of facilities and returning 3,300 students to classrooms.","og_url":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/","og_site_name":"Dynamic Group","article_published_time":"2025-09-29T16:03:14+00:00","article_modified_time":"2025-10-24T21:33:42+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg","type":"image\/jpeg"}],"author":"Leslie Leavoy","twitter_card":"summary_large_image","twitter_creator":"@dynamic_grp","twitter_site":"@dynamic_grp","twitter_misc":{"Written by":"Leslie Leavoy","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#article","isPartOf":{"@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/"},"author":{"name":"Leslie Leavoy","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/4592d5856e4effd27663f9e5975ec81a"},"headline":"Reconstructing Calcasieu Parish Public Schools","datePublished":"2025-09-29T16:03:14+00:00","dateModified":"2025-10-24T21:33:42+00:00","mainEntityOfPage":{"@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/"},"wordCount":456,"publisher":{"@id":"https:\/\/mybncsite.com\/dynamic\/#organization"},"image":{"@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage"},"thumbnailUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg","articleSection":["Infrastructure"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/","url":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/","name":"Calcasieu Parish School Reconstruction | Dynamic Group","isPartOf":{"@id":"https:\/\/mybncsite.com\/dynamic\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage"},"image":{"@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage"},"thumbnailUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg","datePublished":"2025-09-29T16:03:14+00:00","dateModified":"2025-10-24T21:33:42+00:00","description":"Dynamic delivered $61M in Calcasieu Parish school reconstruction, restoring 900,000 sq. ft. of facilities and returning 3,300 students to classrooms.","breadcrumb":{"@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#primaryimage","url":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg","contentUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2025\/09\/New-Sarpy-Elementary-1-scaled.jpg","width":2560,"height":1707,"caption":"default"},{"@type":"BreadcrumbList","@id":"https:\/\/mybncsite.com\/dynamic\/calcasieu-parish-school-reconstruction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mybncsite.com\/dynamic\/"},{"@type":"ListItem","position":2,"name":"Reconstructing Calcasieu Parish Public Schools"}]},{"@type":"WebSite","@id":"https:\/\/mybncsite.com\/dynamic\/#website","url":"https:\/\/mybncsite.com\/dynamic\/","name":"Dynamic Group","description":"We deliver excellence.","publisher":{"@id":"https:\/\/mybncsite.com\/dynamic\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mybncsite.com\/dynamic\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mybncsite.com\/dynamic\/#organization","name":"Dynamic Group","url":"https:\/\/mybncsite.com\/dynamic\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/","url":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png","contentUrl":"https:\/\/mybncsite.com\/dynamic\/wp-content\/uploads\/2023\/09\/dynamic-logo.png","width":200,"height":80,"caption":"Dynamic Group"},"image":{"@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/dynamic_grp","https:\/\/www.linkedin.com\/company\/dynamic-construction-group\/"]},{"@type":"Person","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/4592d5856e4effd27663f9e5975ec81a","name":"Leslie Leavoy","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mybncsite.com\/dynamic\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/2210438cb9701e1718ab9c1e42615aa2fe7c9f50562d652a5410003891efc2f3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2210438cb9701e1718ab9c1e42615aa2fe7c9f50562d652a5410003891efc2f3?s=96&d=mm&r=g","caption":"Leslie Leavoy"},"url":"https:\/\/mybncsite.com\/dynamic\/author\/leslie\/"}]}},"_links":{"self":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts\/680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/comments?post=680"}],"version-history":[{"count":8,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts\/680\/revisions"}],"predecessor-version":[{"id":985,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/posts\/680\/revisions\/985"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/media\/727"}],"wp:attachment":[{"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/media?parent=680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/categories?post=680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mybncsite.com\/dynamic\/wp-json\/wp\/v2\/tags?post=680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}